Most factories draw the most power between 08:00 and 17:00, exactly when panels produce, so almost every unit is used on site.
What we do
- Drone roof survey and a structural check by a civil engineer
- System sized from 12 months of real load data, never oversized
- All permits handled: ERC, utility and building permit (no factory licence needed since 28 Dec 2024)
- Installed by our own crews, no subcontractors
Two ways to buy
Invest for the highest return, or sign a power purchase agreement (PPA) with no upfront cost and pay 15–25% less than the grid tariff.



