No upfront cost; the client pays 20% below the grid tariff for 15 years
The challenge
Install without stopping production, and reinforce parts of the roof first.
What we did
- Drone survey and 12 months of load analysis
- Reinforced purlins where the roof was too weak
- Phased installation outside working hours
- Connected monitoring to our control room
The PPA cut our energy cost without touching our capital budget.