13.9 MWp installed · 9,269 t CO₂ avoided a year
ARUNAENERGY Estimate savings

Projects / Factories

2.4 MWp distribution centre

Eastern Logistics Park · Chonburi · 2025

System size2.4 MWp
Yearly output3,360 MWh
Yearly saving฿11.8M
CO₂ avoided a year1,596 t

An 18,000 m² roof completed in 75 days without stopping warehouse operations

The challenge

Install without stopping production, and reinforce parts of the roof first.

What we did

  • Drone survey and 12 months of load analysis
  • Reinforced purlins where the roof was too weak
  • Phased installation outside working hours
  • Connected monitoring to our control room