Corporate website demo, company, clients and figures are fictional
Try the back officeGet this system
13.9 MWp installed · 9,269 t CO₂ avoided a year
ARUNAENERGY Estimate savings

Solutions

Operations and maintenance

Panel cleaning, thermal inspection and monthly reports

Unmaintained systems lose 10–20% of output within three years. Our O&M team watches every system from a 24-hour control room and is on site within 48 hours when something is wrong.

Package

  • Panel cleaning 2–4 times a year
  • Thermal hot-spot inspection
  • Monthly production and savings report

O&M packages

BasicStandardPremium
Price per kWp a year฿600฿900฿1,300
Example, 500 kWp฿300,000/yr฿450,000/yr฿650,000/yr
Site visits2 a year4 a year12 a year
Panel cleaning2 a year4 a year6 a year
Thermal scan–✓✓
24-hour monitoring–✓✓
On site within72 h24 h4 h
ReportQuarterlyMonthlyMonthly
Output guarantee––95% of forecast

Prices exclude VAT. Systems we install get Standard free for the first year.

Get an O&M quote