Corporate website demo, company, clients and figures are fictional
Try the back officeGet this system
13.9 MWp installed · 9,269 t CO₂ avoided a year
ARUNAENERGY Estimate savings

Projects / Hospitals and schools

420 kWp solar carport for a hospital

Muang Mai Hospital · Pathum Thani · 2025

System size420 kWp
Yearly output588 MWh
Yearly saving฿2.4M
CO₂ avoided a year279 t

A 360-car canopy that shades patients and powers theatres and air conditioning

The challenge

Install without stopping production, and reinforce parts of the roof first.

What we did

  • Drone survey and 12 months of load analysis
  • Reinforced purlins where the roof was too weak
  • Phased installation outside working hours
  • Connected monitoring to our control room